The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.
Glue down wood flooring on concrete.
The moisture cure urethanes took the lead and the south was now able to enjoy solid wood flooring installations directly over their concrete slabs.
Yes you can and i glue together and install tongue and groove white oak flooring into panels and glue those sections onto the concrete floor in my shop u.
The following is a rundown of all the basics you need to know about these two installation methods.
Subfloor slab prep underlayment kevin mullany is the owner of benchmark wood floors inc.
There were challenges for sure.
A sidebar offers advice on checking the concrete slab for moisture before you start.
One subtlety that some did not realize was that solid boards used successfully for glue down installation were not the same as those used for nail down.
Installing engineered wood flooring is a great project for the diyer who desires the look of a professional wood floor with the strength and longevity offered by its sturdy design.
Kevin currently serves on the nwfa board of directors and several nwfa.
As you have read in part 1 part 2 there are multiple methods of installing hardwood flooring both engineered and solid.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
This step by step guide written by a florida flooring contractor covers everything from leveling the slab to laying out and installing the tongue and groove planks for glue wood flooring.
Applications are more prominent with residential construction in sunbelt areas commercial locations and high rise dwellings.
If this were a glue down job we would use a steel trowel along the edges of the underlayment to make sure they are as smooth as possible.
In part 3 we will examine the pros and cons of choosing the glue down method of installation.
When working on a clean concrete subfloor the glue down method is often the go to choice.
A vapor retarder is recommended anytime solid 3 4 wood flooring is installed over concrete.
Glue down hardwood floors on concrete.
If necessary add vapor retarder before applying underlayment.
Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
Before the installation begins it is important to perform a thorough job site inspection.
See more on this topic.